Modernisation de l'installation de remplissage de GPL de Halalo à Wallis
DÉTAILS DU PROJET
We provide design and supply of equipment for upgrading of an LPG plant with new components as the tanks, pumps and filling facilities, all connected and integrated into the exiting plant.
GENERAL
- Period : 2021-2022
- Situation : Wallis, Walis et Futuna
- Customer : Total Pacifique SWAFEPP
SERVICES
The contract includes the basic and detailed design, the procurement of the main mechanical equipment and all electrical part, the erection work assistance and the final commissioning at site.
DESCRIPTION
- Two LPG bullet tanks
- Tanks utilities (fire-fighting, safety valve, instrumentation, gauging panel)
- LPG pumping station with new LPG piping network
- Cylinder bottling facilities
- All necessary utilities (fire-fighting system, compressed air network, electricity, SCADA)
- Connection to exiting network